Jun
20
2015

Order Tara's Bicycle Touring Cookbook Today!

Workshop Progress Update

by Going Slowly

We have dry drywall on the west side of the building:

Framed Wall Covered with Drywall

The pony walls are basically complete:

Trimming out the Pony Wall

The rough framing for the windows is underway:

Grindbygg Window Framing Tyler Testing Window in Framing

We've disassembled, stained and reassembled most of the windows:

Tara Staining Windows Tara Staining Windows Tara Staining Windows Tyler Reassembling Windows

Things are coming together!